Description
|
Date |
143 |
Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Aggregate Revenue Requirement & Tariff for FY 2024-25 for Jharkhand Biji Vitran Nigam Limited (JBVNL) |
30.09.2024 |
142 |
Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24 and Aggregate Revenue Requirement & Tariff for FY 2024-25 and Business Plan for 11 KV for Damodar Valley Corporation (DVC) |
30.09.2024 |
141 |
Order on True-up for FY 2016-17 to FY 2020-21 for Tenughat Vidyut Nigam Limited (TVNL) |
30.09.2024 |
140 |
Order on True-up for FY 2020-21, FY 2021-22, & FY 2022-23, for Adhunik Power and Natural Resources Limited (APNRL) |
22.08.2024 |
139 |
Order on True-up for FY 2022-23, Annual Performance Review of FY 2023-24, and ARR & Retail Supply Tariff for FY 2024-25 for Steel Authority of India Limited, Bokaro |
20.08.2024 |
138 |
Order on APR for FY 2023-24 for Inland Power Limited (IPL) |
23.07.2024 |
137 |
Order on True-up for FY 2022-23 for Inland Power Limited (IPL) |
23.07.2024 |
136 |
Order on True-up for FY 2022-23, APR for FY 2023-24, Business Plan for FY 2021-22 to FY 2025-26, ARR and Tariff Petition for FY 2024-25 for Jharkhand Urja Sancharan Nigam Limited |
03.07.2024 |
135 |
Order on True-up for FY 2020-21 & FY 2021-22 APR for FY 2022-23 & ARR and Tariff Petition for FY 2023-24 for Jharkhand Urja Sancharan Nigam Limited |
03.07.2024 |
134 |
Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Aggregate Revenue Requirement & Tariff for FY 2024-25 for Tata Steel Utilities and Infrastructure Services Limited |
26.06.2024 |
133. |
Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24, and Aggregate Revenue Requirement & Tariff for FY 2024-25 for Tata Steel Limited (TSL) |
26.06.2024 |
132 |
Order on True-up for FY 2022-23, Annual Performance Review for FY 2023-24 for Tata Power Company Limited (TPCL) |
06.06.2024 |
131 |
Order on Petition for True Up for FY 2019-20, APR for FY 2020-21, Business Plan and ARR for MYT control period FY 2021-22 to FY 2025-26 & SLDC charges for FY 2021-22 for STATE LOAD DESPATCH CENTRE (SLDC), JUSNL |
06.06.2024 |
130 |
Order on True up for 2021-22, Annual Performance Review for FY 2022-23 and Aggregate Revenue Requirment & Tariff for FY 2023-24 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
28.02.2024 |
129 |
Order on True up for 2020-21, Annual Performance Review for FY 2021-22 and Aggregate Revenue Requirment & Tariff for FY 2022-23 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
28.02.2024 |
128 |
Order on True-up petition for FY 2016-17 to FY 2020-21, Business Plan & MYT Tariff Petition for FY 2021-22 to FY 2025-26 for Jharkhand Urja Utpadan Nigam Limited (JUUNL) |
26.02.2024 |
127 |
Order on True-up for FY 2021-22 for Inland Power Limited (IPL) |
26.02.2024 |
126 |
Order on True-up for FY 2021-22, Annual Performance Review of FY 2022-23, and ARR & Retail Supply Tariff for FY 2023-24 for Steel Authority of India Limited, Bokaro |
22.02.2024 |
125 |
Corrigendum -True-up for FY 2021-22, Annual Performance Review for FY 2022-23, and Aggregate Revenue Requirement & Tariff for FY 2023-24 for Damodar Valley Corporation (DVC) |
19.02.2024 |
124 |
Order on True-up for FY 2021-22, Annual Performance Review for FY 2022-23, and Aggregate Revenue Requirement & Tariff for FY 2023-24 for Damodar Valley Corporation (DVC) |
22.01.2024 |
123 |
Order on True-up for FY 2020-21, Annual Performance Review for FY 2021-22, and Aggregate Revenue Requirement & Tariff for FY 2022-23 for Damodar Valley Corporation (DVC) |
22.01.2024 |
122 |
Order on True-up for FY 2021-22, Annual Performance Review for FY 2022-23 for Tata Power Company Limited (TPCL) |
09.01.2024 |
121 |
Order on Business Plan, and Tariff for MYT from FY 2021-22 to FY 2025-26 for Adhunik Power and Natural Resources Limited (APNRL) |
14.12.2023 |
120 |
Order on True-up for FY 2012-13 to FY 2015-16, for Tenughat Vidyut Nigam Limited (TVNL) |
14.12.2023 |
119 |
Order on Petition for Business Plan and Multi Year Tariff for the period FY 2021-22 to FY 2025-26 for Tenughat Vidyut Nigam Limited (TVNL) |
14.12.2023 |
118 |
Order on Business Plan and Multi Year Tariff for Control Period FY 2021-22 to FY 2025-26 for Inland Power Limited (IPL) |
16.11.2023 |
117 |
Order on Category-wise Retail Supply Tariff from FY 2006-07 to FY 2011-12 for Damodar Valley Corporation (DVC) |
31.10.2023 |
116 |
Corrigendum to the order dated September 29, 2023 on True-up for FY 2021-22, Annual Performance Review for FY 2022-23, and Aggregate Revenue Requirement & Tariff for FY 2023-24 for Tata Steel Utilities & Infrastructure Services Limited in Case (Tariff) no. 17 of 2022 |
30.10.2023 |
115 |
Order on True-up for FY 2021-22, Annual Performance Review for FY 2022-23, and Aggregate Revenue Requirement & Tariff for FY 2023-24 for Tata Steel Utilities and Infrastructure Services Limited |
29.09.2023 |
114 |
Order on True-up for FY 2020-21, Annual Performance Review for FY 2021-22, and Aggregate Revenue Requirement & Tariff for FY 2022-23 for Tata Steel Utilities and Infrastructure Services Limited |
29.09.2023 |
113 |
Order on True-up for FY 2021-22, Annual Performance Review for FY 2022-23, and Aggregate Revenue Requirement & Tariff FY 2023-24 for Tata Steel Limited (TSL) |
29.09.2023 |
112 |
Order on True-up for FY 2020-21, Annual Performance Review for FY 2021-22, and Aggregate Revenue Requirement & Tariff FY 2022-23 for Tata Steel Limited (TSL) |
29.09.2023 |
111 |
Order on True-up for FY 2019-20, Annual Performance Review of FY 2020-21, Business Plan& Multi Year Tariff for the Control Period FY 2021-22 to FY 2025-26 for Jharkhand Urja Sancharan Nigam Limited |
23.06.2023 |
110 |
Order on True-up for FY 2018-19 for Jharkhand Urja Sancharan Nigam Limited |
23.06.2023 |
109 |
Order on True-up for FY 2017-18, FY 2018-19, FY 2019-20 and Annual Performance Review for FY 2020-21 for Adhunik Power and Natural Resources Limited (APNRL) |
22.06.2023 |
108 |
Order on True-up for FY 2019-20 & FY 2020-21, Multi Year Tariff and Business Plan for Control Period FY 2021-22 to FY 2025-26, Annual Performance Review of FY 2021-22, & ARR and Retail Supply Tariff for FY 2021-22 & FY 2022-23 for Steel Authority of India Limited, Bokaro |
22.06.2023 |
107 |
Order on True-up for FY 2017-18 for Jharkhand Urja Sancharan Nigam Limited |
12.06.2023 |
106. |
True-up for FY 2019-20, Annual Performance Review for FY 2020-21 and Approval of Business Plan and MYT for the Control Period from FY 2021-22 to FY 2025-26 and Tariff Determination for FY 2021-22 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
01.06.2023 |
105 |
Order on True-up for FY 2020-21 for Inland Power Limited (IPL) |
22.05.2023 |
104 |
Order on True-up for FY 2020-21, Annual Performance Review for FY 2021-22 for Tata Power Company Limited (TPCL) |
22.05.2023 |
103. |
Order on True-up for FY 2016-17 and Annual Performance Review for FY 2017-18 for Adhunik Power and Natural Resources Limited (APNRL) |
22.05.2023 |
102 |
Order on Determination of ARR for MYT Period from FY 2021-22 to 2025-26 and Tariff for FY 2021-22 for Damodar Valley Corporation (DVC). |
31.01.2023 |
101 |
Order on True-up for FY 2019-20 and Annual Performance Review for FY 2020-21 for Damodar Valley Corporation (DVC). |
31.01.2023 |
100 |
Corrigendum to the order dated November 24, 2022 on Business Plan and MYT Petition for the Control Period from FY 2021-22 to FY 2025-26 and Tariff determination for FY 2021-22 for Tata Steel Utilities & Infrastructure Services Limited issued by the Commission in Case (Tariff) no. 12 of 2020 |
11.01.2023 |
99 |
Corrigendum to the Order dated November 24, 2022 on Business Plan and MYT Plan and MYT Petition for the Control Period from FY 2021-22 to FY 2025-26 and Tariff determination for FY 2021-22 for Tata Steel Limited issued by the Commission in Case (Tariff) no. 13 of 2020 |
11.01.2023 |
98 |
Order on True-up for FY 2019-20 and Annual Performance Review for FY 2020-21 for Tata Steel Limited (TSL) |
24.11.2022 |
97 |
Order on Approval of Business Plan and MYT Petition for the Control Period from FY 2021-22 to FY 2025-26 and Tariff Determination for FY 2021-22 for Tata Steel Limited (TSL) |
24.11.2022 |
96 |
Approval of Business Plan and MYT Petition for the Control Period from FY 2021-22 to FY 2025-26 and Tariff Determination for FY 2021-22 for Tata Steel Utilities and Infrastructure Services Limited |
24.11.2022 |
95 |
True-up for FY 2019-20 and Annual Performance Review for FY 2020-21 for Tata Steel Utilities and Infrastructure Services Limited |
24.11.2022 |
94. |
Order on True-up for FY 2019-20, Business Plan and MYT Petition for Control Period from FY 2021-22 to FY 2025-26 for Tata Power Company Limited (TPCL) |
04.11.2022 |
93. |
Order on True-up for FY 2019-20 and Annual Performance Review for FY 2020-21 for Inland Power Limited (IPL) |
04.11.2022 |
92. |
Order on True-up for FY 2016-17 to FY 2018-19 & Suo-Motu Order on ARR of FY 2020-21 for Steel Authority of India Limited, Bokaro |
08.01.2021 |
91. |
Order on Petition for determination of Pre-fixed levelized tariff for purchase of power by Discoms from decentralized Solar Power Plants and other Renewable Energy Generation Plants having capacity of 500 kW to 2 MW to be set up by Individual Farmers/Group of Farmers/Cooperatives/ Panchayats/Farmer Producer Organizations (FPO)/Water User Associations (WUA) in the vicinity of rural grid sub-stations under Component-A of the Pradhan Mantri Kisan Urja Suraksha evem Utthan Mahabhiyan (PM KUSUM) Scheme introduced by Government of India (GoI). |
08.01.2021 |
90. |
Order on True-up for FY 2015-16 and FY 2016-17 for Jharkhand Urja Sancharan Nigam Limited |
30.12.2020 |
89. |
Corrigendum to the Order on Truing up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 for DVC issued by the Commission on September 30, 2020 in Case (Tariff) No. 01 of 2020 & Case (Tariff) No. 02 of 2020 |
07.12.2020 |
88 |
Corrigendum to the Order on Truing up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 for JBVNL issued by the Commission on October 01, 2020 in Case (Tariff) no. 13 of 2019 |
19.10.2020 |
87 |
JBVNL- True up for FY 2018-19, APR for FY 2019-20 & ARR for FY 2020-21 |
01.10.2020 |
86 |
DVC- True up for FY 2018-19, APR for FY 2019-20 & ARR for FY 2020-21 |
30.09.2020 |
85 |
DVC- True up for FY 2017-18 |
29.09.2020 |
84 |
Corrigendum to the Order on Truing up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 for TSUISL issued by the Commission on September 29, 2020 in Case (Tariff) No. 10 of 2019 |
19.10.2020 |
83 |
TSUISL- True up for FY 2018-19, APR for FY 2019-20 & ARR for FY 2020-21 |
29.09.2020 |
82 |
Corrigendum to the Order on Truing up for FY 2018-19, APR for FY 2019-20 and ARR & Tariff for FY 2020-21 for TSL issued by the Commission on September 29, 2020 in Case (Tariff) No. 11 of 2019 |
19.10.2020 |
81 |
TSL- True up for FY 2018-19, APR for FY 2019-20 & ARR for FY 2020-21 |
29.09.2020 |
80. |
Order on True up for FY 2018-19 for Inland Power Limited (IPL) |
22.09.2020 |
79. |
Order on True-up for FY 2018-19 and Annual Performance Review for FY 2019-20 for Tata Power Company Limited (TPCL) |
09.09.2020 |
78. |
Order on True-up for FY 2016-17 and FY 2017-18 for Jamshedpur Utitlties & Services Company Limited (JUSCO) |
19.06.2020 |
77. |
Order on True-up for FY 2016-17 & FY 2017-18 for Tata Steel Limited (TSL) |
26.05.2020 |
76. |
Corrigendum to the Order on Truing up for FY 2017-18, APR for FY 2018-19 and Mid-Term Review for Revised ARR and Generation Tariff for FY 2019-20 & FY 2020-21 for TPCL issued by the Commission on February 14, 2020 in Case (Tariff) no. 01 of 2019 |
16.03.2020 |
75. |
Order on Petition for Multi Year Tariff for the period FY 2017-21 (Including truing-up For FY 2014-15 & provisional true-up of FY 2015-16) For Tenughat Vidyut Nigam Limited (TVNL) |
28.02.2020 |
74. |
Order on True-up for FY 2017-18, Annual Performance Review for FY 2018-19 and Mid-Term Review for Revised Annual Revenue Requirement and Generation Tariff for FY 2019-20 & FY 2020-21 for Tata Power Company Limited (TPCL) |
14.02.2020 |
73. |
Order on True-up for FY 2016-17 for
Tata Power Company Limited (TPCL) |
27.12.2019 |
72. |
Order on Annual Performance Review for FY 2018-19 for Inland Power Limited (IPL) |
26.12.2019 |
71. |
Order on True-up for FY 2016-17 and FY 2017-18
for
Inland Power Limited (IPL) |
01.10.2019 |
70. |
Order on True-up for FY 2016-17, Annual Performance Review for FY 2017-18 & FY 2018-19 and ARR & Tariff for FY 2019-20 for Damodar Valley Corporation (DVC). |
28.05.2019 |
69. |
Corrigendum to the order dated 08th March’19 for APNRL issued by the Commission in Case No. 05 of 2018 |
10.04.2019 |
68. |
Tariff order on True-up for FY 2016-17 & FY 2017-18, Annual Performance Review for FY 2018-19 and ARR & Tariff for FY 2019-20 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
28.02.2019 |
67. |
Order on True-up for FY 2013-14 (06th Jan 2014 to 31st March 2014) to FY 2014-15 for Jharkhand Urja Sancharan Nigam Limited. (JUSNL) |
01.02.2019 |
66. |
Order on approval of Business plan and determination of ARR for the control period FY 2016-17 to FY 2020-21 (including True up for the period 6 th Jan 2014 - 31st Mar 2014, FY 2014-15 and FY 2015-16) for Jharkhand Urja Utpadan Nigam Limited (JUUNL) |
25.09.2018 |
65. |
Corrigendum to the Order on True-up for FY 2015-16, Annual Performance Review for FY 2016-17 and ARR and Tariff for FY 2017-18 for Tata Steel Limited (TSL) issued by the Commission on 18.05.2018 in Case (T) No: 11 of 2017. |
07.06.2018 |
64. |
Order on True-up for FY 2013-14 to FY 2015-16 and approval of Business plan and ARR for MYT Control Period FY 2016-17 to FY 2020-21 and Distribution and Retail Supply Tariff for FY 2016-17 for Steel Authority of India Limited, Bokaro |
07.06.2018 |
63. |
Order on True up for FY 2015-16 and Annual Performance Review of FY 2016-17 and Determination of Annual Revenue requirement (ARR) and Tariff for FY 2017-18 for Jamshedpur Utilities & Services Company Limited (JUSCO). |
07.06.2018 |
62. |
Corrigendum to the Order on Annual Performance Review for FY 2016-17 and Determination of Revised ARR and Tariff for the FY 2017-18 & FY 2018-19 for JBVNL issued by the Commission on 27.04.2018 |
18.05.2018 |
61. |
Order on True up for FY 2015-16, And Annual Performance Review of FY 2016-17, And ARR and Tariff for FY 2017-18 for Tata Steel Limited (TSL) |
18.05.2018 |
60. |
Order on True-up for FY 2015-16 And ARR for MYT Period FY 2016-17 to FY 2020-21 And Determination of Tariff for FY 2016-17 for DVC Command Area of Jharkhand |
18.05.2018 |
59. |
Order on True-up of erstwhile JSEB for FY 2011-12 to FY 2013-14 (up to 5th Jan’14) and JBVNL for FY 2013-14(6th Jan’14 to 31st Mar’14) to FY 2015-16 |
27.04.2018 |
58. |
Order on Annual Performance Review for FY 2016-17 and Determination of Revised ARR and Tariff for the FY 2017-18 & FY 2018-19 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
27.04.2018 |
57. |
Order on approval of True up of ARR for FY 2015-16 for Inland Power Ltd. (IPL) |
19.03.2018 |
56. |
Tariff Order on Approval of Business Plan And ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Transmission and SLDC Tariff for FY 2016-17 for Jharkhand Urja Sancharan Nigam Ltd |
24.02.2018 |
55. |
Tariff Order on True-Up for FY 2014-15 & FY 2015-16, Business Plan, Aggregate Revenue Requirement and Tariff for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 for Adhunik Power and Natural Resources Limited (APNRL) |
19.02.2018 |
54. |
Order on approval of Business plan and determination of ARR for the control period FY 2016-17 to FY 2020-21 (including True up for FY 2015-16 ) for Tata Power Company Limited (TPCL) |
19.02.2018 |
53. |
Order on Approval of Business Plan and ARR for MYT Control Period FY 2016-17 to FY 2020-21 And Distributin and Retail Supply Tariff for FY 2016-17 for Jharkhand Bijli Vitran Nigam Limited (JBVNL) |
21.06.2017 |
52. |
Order on Determination of Levellised Generation Tariff for 11.5 MW Municipal Solid Waste (MSW) Project of Ranchi Municipal Solid Waste Private Limited (RMPL) |
21.06.2017 |
51. |
Order on Petition for Approval of Capital Cost, True Up of ARR for FY 2014-15 and Annual Performance Review for FY 2015-16 and ARR and Tariff Determination for the period FY 2016-17 to FY 2020-21 for Inland Power Limited (IPL) |
16.05.2017 |
50. |
Order on True-up for FY 2006-07 to FY 2013-14 and Annual Performance Review for FY 2014-15 for DVC Command Area of Jharkhand |
19.04.2017 |
49. |
Order on True up for FY 2014-15 and Annual Performance Review of FY 2015-16 and Business Plan & ARR for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 and Tariff for FY 2016-17 for Jamshedpur Utilities & Services Company Limited (JUSCO) |
28.02.2017 |
48. |
Order on True up for FY 2014-15 and Annual Performance Review of FY 2015-16 and Business Plan and ARR for Multi Year Tariff Period from FY 2016-17 to FY 2020-21 and Tariff for FY 2016-17 for Tata Steel Limited (TSL) |
28.02.2017 |
47. |
Order on Annual Performance Review Petition for FY 2015-16 (Including True up for FY 2013-14 and True up for FY 2014-15) for Tata Power Company Limited (TPCL) |
30.12.2016 |
46. |
Order on Petition for Annual Performance Review For FY 2014-15(Including truing-up For FY 2012-13 & FY 2013-14)For Tenughat Vidyut Nigam Limited (TVNL) |
30.09.2016 |
45. |
Order on Petition for Approval of Final Capital Cost, True Up of ARR for FY 2012-13 and FY 2013-14 and Annual Performance Review for FY 2014-15 And ARR and Tariff Determination for FY 2015-16 for Adhunik Power and Natural Resources Limited (APNRL) |
01.09.2016 |
44. |
Provisional Tariff Order on Review of ARR for FY 2013-14 (6th Jan 14 – 31st Mar 14) & FY 2014-15 and ARR and Distribution Tariff for FY 2015-16 for Jharkhand Bijli Vitran Nigam Limited (JBVNL). |
14.12.2015 |
43. |
Provisional Tariff Order on Review of ARR for FY 2013-14 (6th January 2014 to 31st March 2014) & FY 2014-15 and ARR and Transmission Tariff for FY 2015-16 for Jharkhand Urja Sancharan Nigam Ltd (JUSNL). |
14.12.2015 |
42. |
Order on Determination of Levellised Generation Tariff for 1.2 MW Grid Connected Solar PV Project of Chotanagpur Green Energy Development Pvt. Ltd (CGEDPL)
|
08.07.2015 |
41. |
Order on True up for FY 2013-14 and Annual Performance Review of FY 2014-15 and Revised ARR and Tariff for FY 2015-16 for Jamshedpur Utilities & Services Company Limited (JUSCO).
|
31.05.2015 |
40. |
Order on True up for FY 2013-14 and Annual Performance Review of FY 2014-15 and Revised ARR and Tariff for FY 2015-16 for Tata Steel Limited (TSL) |
31.05.2015 |
39. |
Order on Annual Performance Review Petition for FY 2013-14 (Including revised true up for FY 2011-12 and
True up for FY 2012-13) for Tata Power Company Limited (TPCL) |
31.05.2015 |
38. |
Multi Year Order for Determination of ARR from FY 2013-14 to FY 2015-16 and Retail Supply Tariff for DVC Command area of Jharkhand Damodar Valley Corporation (DVC) |
04.09.2014 |
37 |
MYT Order for the period FY 2013-14, FY 2014-15 and FY 2015-16 of SAIL-Bokaro |
03.09.2014 |
36. |
Order on Petition for Annual Performance Review for FY 2012-13 (including truing-up for FY 2011-12) for Tenughat Vidyut Nigam Limited (TVNL) |
02.07.2014 |
35 |
Tariff Order on True up for FY 2011-12 & FY 2012-13 and ARR for
Multi-Year Tariff Period from FY 2013-14 to FY 2015-16 and Tariff for
FY 2013-14 for Jamshedpur Utilities & Services Company Limited |
04.06.2014 |
34. |
Tariff Order on True up for FY 2011-12 & FY 2012-13 and ARR for
Multi-Year Tariff Period from FY 2013-14 to FY 2015-16 and Tariff for
FY 2013-14 for Tata Steel Limited (TSL).
|
04.06.2014 |
33. |
Provisional
MYT Order on Business Plan and Annual Revenue Requirement and
Determination of Generation Tariff for FY 2013-14 to FY 2015-16 for
Inland Power Ltd. (IPL) |
27.05.2014 |
32. |
Provisional Order on
Petition for approval of Capital Cost,
Business Plan and MYT Petition for FY 2012-13 to FY 2015-16 for
Adhunik Power and Natural Resources Limited (APNRL). |
26.05.2014 |
31. |
Order
on Annual Performance Review Petition for FY 2012-13 (including
truing-up for FY 2011-12) for Tata Power Company Limited (TPCL). |
28.04.2014 |
30 |
Provisional Tariff Order on ARR and
Determination of Retail Tariffs for Jharkhand Area FY Year 2012-13
for Damodar Valley Corporation (DVC). |
22.11.2012 |
29. |
Provisional Tariff Order on ARR for Financial Years 2010-11, 2011-12 &
2012-13 and Determination of Distribution Tariff for Financial Year
2012-13 for SAIL-Bokaro. |
03.08.2012 |
28. |
Final True up of JSEB for FY 2003-04
to FY 2010-11and MYT Order for Generation Business for First Control
Period (FY 2012-13 to FY2015-16) and ARR for FY 2011-12 & FY 2012-13
for Transmission & Distribution Business and Determination of Tariff
for FY 2012-13 for Jharkhand State Electricity Board(JSEB). |
02.08.2012 |
27. |
Tariff Order on ARR for FYs 2010-11
& 2011-12 and Determination of Distribution Tariff for FY 2012-13 for
Tata Steel Limited (TSL). |
15.06.2012 |
26. |
Tariff Order on ARR for FYs 2010-11 &
2011-12 and Determination of Distribution Tariff for FY 2012-13 for
Jamshedpur Utilities & Services
Company Limited (JUSCO). |
15.06.2012 |
25. |
MYT Order on Business Plan and Annual Revenue Requirement and
Determination of Generation Tariff for First control period of FY
2012-13 to 2015-16 for Tata Power Company Limited (TPCL). |
31.05.2012 |
24. |
MYT Order on Business Plan and
Annual Revenue Requirement and Determination of Generation Tariff for
First Control Period of FY 2012-13 to 2015-16 for Tenughat Vidyut
Nigam Limited (TVNL). |
30.05.2012 |
23. |
Tariff Order on Determination of Generation Tariff
for Rake Power Limited (RPL) for its Bio-mass Power Plant. |
20.10.2011 |
22. |
Tariff Order for SAIL-Bokaro 2011-12. |
28.09.2011 |
21. |
Tariff Order for JUSCO FY 2011-12. |
27.08.2011 |
20. |
Tariff Order for TSL FY 2011-12. |
27.08.2011 |
19. |
Tariff Order for TPCL FY 2011-12. |
20.08.2011 |
18. |
Provisional Tariff Order for JSEB FY 2011-12 (Effective from 1st
August 2011). |
22.07.2011 |
17. |
Tariff Order on Annual Revenue Requirement and
Determination of Generation Tariff for Financial Years 2010-11
& 2011-12 for Tenughat Vidyut Nigam Limited (TVNL). |
31.05.2011 |
16. |
Tariff Order on Annual Revenue Requirement and Determination of
Generation Tariff for Financial Years 2009-10 & 2010-11 for Tenughat
Vidyut Nigam Limited (TVNL). |
22.11.2010 |
15. |
Tariff Order
on ARR for FY 2007-08, 2008-09, 2009-10 & 2010-11 and Determination
of Distribution Tariff for Financial Year 2010-11 for Tata Steel
Limited (TSL). |
27.10.2010 |
14. |
SAIL-Bokaro Provisional Tariff Order
on Annual Revenue Requirement for Financial Years 2008-09, 2009-10 &
2010-11 and Determination of Distribution Tariff for Financial Year
2010-11. |
09.10.2010 |
13. |
Tariff Order on ARR for FY 2007-08, 2008-09, 2009-10 & 2010-11 and
Determination of Distribution Tariff for FY 2010-11 for
Jamshedpur Utilities & Services Company Limited (JUSCO). |
24.08.2010 |
12. |
Tariff Order on Annual Revenue Requirement and Determination
of Generation Tariff for Financial Year 2010-11 for Tata Power
Company Limited (TPCL). |
22.07.2010 |
11. |
Tariff
Order for JSEB (Provisional) FY - 2010-11 (Effective from 1st May
2010). |
26.04.2010 |
10. |
Tariff
Order
on ARR and
Determination of Generation Tariff for
FY2008-09 &2009-10
for Tenughat Vidyut Nigam Limited
(TVNL) |
05.03.2010 |
9. |
Tariff Order on
ARR for FY 2007-08, 2008-09 & 2009-10
& Determination of Distribution Tariff for
FY 2009-10 for
TSL |
20.01.2010 |
8. |
Tariff Order on
ARR for FY 2007-08, 2008-09 & 2009-10
& Determination of Distribution Tariff for
FY 2009-10 for
TPCL
|
20.01.2010 |
7. |
Tariff Order on
ARR for FY 2007-08, 2008-09 & 2009-10
& Determination of Distribution Tariff for
FY 2009-10 for
(JUSCO) |
20.01.2010 |
6. |
TARIFF ORDER FOR
TVNL 2007-2008
|
3.01.2008 |
5. |
TARIFF ORDER FOR JSEB FY
2006-2007 |
31.08.2007 |
4. |
Tariff Order For
Tenughat Vidyut Nigam Limited (TVNL)
FY 2005-06 |
30.03.2006 |
3. |
Tariff Order For
Tata Steel
FY 2005-06 |
30.03.2006 |
2. |
Tariff
Order For TVNL FY 2004-2005 |
23.08.2004 |
1. |
Tariff Order
For JSEB FY 2003-2004. |
27.12.2003 |