75. Non-providing electric connection to village-Kuttam, P.O - Chhotamuri, P.S - Sill, Dist - Ranchi.

13 of 2011

26.02.2011

74.

Finalization of the name of laboratory in which the energy meter of consumers nammely M/s Sukh Sagar Metal Pvt. Ltd. & M/s Shankar Ferro Alloys Ltd. be tested.

15 of 2011

21.02.2011

73.

Suo motu Proceeding to scrutinize the activity regarding reducing the T&D loss, Energy auditing and performance of various generating plants of the licensee - JSEB.

12 of 2011

19.02.2011

72.

An application relating to use of 132 KV Railway owned Transmission line by JSEB for power supply to Chakradharpur Area by violating the MoU signed by JSEB & Railway and fixing of wheeling charges for Transmission of power to Chakradharpur area by JSEB through Railway owned 132 KV Rajkharswan-Chakradharpur Transmission line.

06 of 2011

19.02.2011

71. Review and specify the provisions under Electricity (Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010.

26 of 2010

19.02.2011

70.

An application bringing on record the illegalities and infirmities committed by the Licensee/Jharkhand State Electricity Board in allowing interest on security deposit @ 3.5% and not @ 6% commencing from 10th June,2003 to the Domestic/commercial as well as Low Tension Consumers.

04 of 2011

12.02.2011

69.

An application bringing on record the illegalities committed by the Licensee/Jharkhand State Electricity Board in charging the energy bill over and above the rates and charges prescribed in the Tariff Order 2010.

03 of 2011

12.02.2011

68.

An application challenging the sanction estimate, leving supervision charges @ 21.5% on the entire/erection of 132 KV Bay  and 132 KV D/C Transmission Line prepared by the Licensee/Jharkhand State Electricity Board.

01 of 2011

12.02.2011

67. An application for direction upon Jharkhand State Electricity Board (licensee) to ensure uninterrupted power supply of electricity with proper voltage in terms of the Power Supply Agreement entered into between the parties.

29 of 2010

12.02.2011

66.

Suo motu Proceeding to scrutinize the activity regarding reducing the T&D loss, Energy auditing and performance of various generating plants of the licensee - JSEB.

12 of 2011

12.02.2011

65. Non-providing electric connection to village-Kuttam, P.O - Chhotamuri, P.S - Sill, Dist - Ranchi.

13 of 2011

10.02.2011

64. Tariff filing of JSEB.

33 of 2010

10.02.2011

63. Non-providing Electric Connection to Villagers of Baram (Dipatoli), Mahilong, Namkom, Ranchi.

11 of 2010

09.02.2011

62.

Suo Motu Proceeding to scrutinize the activity regarding reducing the T&D loss, Energy auditing and performance of various generating plants of the licensee - JSEB.

12 of 2011

09.02.2011

61.

An application for direction upon Jharkhand State Electricity Board (licensee) to ensure uninterrupted power supply of electricity with proper voltage in terms of the Power Supply Agreement entered into between the parties.

29 of 2010

22.01.2011

60.

An application bringing on record the illegalities and infirmities committed by the Licensee/Jharkhand State Electricity Board in allowing interest on security deposit @ 3.5% and not @ 6% commencing from 10th June,2003 to the Domestic/commercial as well as Low Tension Consumers.

04 of 2010

22.01.2011

59.

An application bringing on record the illegalities committed by the Licensee/Jharkhand State Electricity Board in charging the energy bill over and above the rates and charges prescribed in the Tariff Order 2010.

03 of 2011

22.01.2011

58.

An application challenging the sanction estimate, leving supervision charges @ 21.5% on the entire/erection of 132 KV Bay  and 132 KV D/C Transmission Line prepared by the Licensee/Jharkhand State Electricity Board.

01 of 2011

22.01.2011

57.

Review and specify the provisions under Electricity (Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010.

26 of 2010

22.01.2011

56.

Filing of Tariff Petitions for FY 2011-12.

30 of 2010

12.01.2011

55. Non-providing electric connection

32 of 2010

10.01.2011

54. Filing of Tariff Petitions for FY 2011-12.

30 of 2010

04.01.2011

53. Introduction of spot billing by JSEB.

31 of 2010

14.12.2010

52. Filing of Tariff Petitions for FY 2011-12.

30 of 2010

04.12.2010

51.

An application for direction upon Jharkhand State Electricity Board (licensee) to ensure uninterrupted power supply of electricity with proper voltage in terms of the Power Supply Agreement entered into between the parties.

29 of 2010

18.12.2010

51.

An application challenging the action of respondent-JSEB in providing the electrical connection to the unauthorized/legal occupants in the township of Fertilizers Corporation of India Ltd., Sindri without following the provision of clause 5.3 (b) of JSERC (Electricity Supply Code) Regulation, 2005.

27 of 2010

18.12.2010

50

Review and specify the provisions under Electricity (Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010.

26 of 2010

18.12.2010

49.

An application challenging the action of respondent-JSEB in providing the electrical connection to the unauthorized/legal occupants in the township of Fertilizers Corporation of India Ltd., Sindri without following the provision of clause 5.3 (b) of JSERC (Electricity Supply Code) Regulation, 2005.

27 of 2010

04.12.2010

48.

Review and specify the provisions under Electricity (Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010

26 of 2010

04.12.2010

47. Show- Cause Notice for Non-providing of electrical connection to the residents of village.

16 of 2008

04.12.2010

46.

Review and specify the provisions under Electricity Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010.

26 of 2010

20.11.2010

45. Show- Cause Notice for Non-providing of electrical connection to the residents of village.

16 of 2010

09.11.2010

44.

Review and specify the provisions under Electricity Supply Code Amendment) Regulations,2010 as gazetted and notified on 01.09.2010.

26 of 2010

09.11.2010

43.

An application challenging the action of respondent-JSEB in providing the electrical connection to the unauthorized/legal occupants in the township of Fertilizers Corporation of India Ltd., Sindri without following the provision of clause 5.3 (b) of JSERC (Electricity Supply Code) Regulation, 2005.

27 of 2010

30.10.2010

42.

An application for concurrence of the State Load Dispatch Center under Regulation 8(1) of the Central Electricity Regulatory Commission Open Access Regulations, 2008 read with clause 3.1 of the Short Term Open Access Inter-State Transmission (Bilateral Transaction) Procedure for scheduling.

22 of 2010

26.10.2010

41.

 An application for concurrence of the State Load Dispatch Center under Regulation 8(1) of the Central Electricity Regulatory Commission Open Access Regulations, 2008 read with clause 3.1 of the Short Term Open Access Inter-State Transmission (Bilateral Transaction) Procedure for scheduling.

22 of 2010

25.10.2010

40.

Petition for review of order on petition for determination of ARR and Tariff Proposal for 2010-11 of JUSCO.

24 of 2010

23.10.2010

39.  Petition for Review of order in case no 05 of 2010.

20 of 2010

23.10.2010

38.

An application for concurrence of the State Load Dispatch Center under Regulation 8(1) of the Central Electricity Regulatory Commission Open Access Regulations, 2008 read with clause 3.1 of the Short Term Open Access Inter-State Transmission (Bilateral Transaction) Procedure for scheduling.

22 of 2010

12.10.2010

37. Order on Show-cause of JSEB for replacement Replacement of existing meters by digital meters at the cost of the consumers.

25 of 2010

11.10.2010

36.

An application for concurrence of the State Load Dispatch Center under Regulation 8(1) of the Central Electricity Regulatory Commission Open Access Regulations, 2008 read with clause 3.1 of the Short Term Open Access Inter-State Transmission (Bilateral Transaction) Procedure for scheduling.

22 of 2010

09.10.2010

35.

Petition for review of order on petition for determination of ARR and Tariff Proposal for 2010-11 of JUSCO.

24 of 2010

09.10.2010

34. Petition for Review of order in case no 05 of 2010.

20 of 2010

09.10.2010

33.

An application for quashing and restraining the respondents- JSEB from taking Security Amount or any other charges without any permission from this Hon'ble Commission.

23 of 2010

30.09.2010

32.

An application for concurrence of the State Load Dispatch Center under Regulation 8(1) of the Central Electricity Regulatory Commission Open Access Regulations, 2008 read with clause 3.1 of the Short Term Open Access Inter-State Transmission (Bilateral Transaction) Procedure for scheduling.

22 of 2010

30.09.2010

31.

An application for a direction to the JSEB to restrain from taking the security amount at the enhanced rate as published in local Daily news paper Hindustan dt.06.07.2010 & also for a direction to the respondents not to charge the security deposit without the permission of this Hon'ble Commission also not to charge from the existing consumers on the load for which the security amount had already been deposited much earlier at the time of taking new connection.

21 of 2010

30.09.2010

30. Petition for Review of order in case no 05 of 2010.

20 of 2010

04.09.2010

29.

Clarification of Tariff Order 2003-04 & 2010-11 in relation to HTS Consumers.

18 of 2010

21.08.2010

28.

An application under Section 86 (i) (f) of the Electricity Act, 2003 for a direction to Respondent -Jharkhand State Electricity Board to sign the Power Purchase  Agreement (PPA) between the Petitioner -BHPC and Respondent -JSEB in respect of sale of power to JSEB from different Hydro Electric Projects located in State of Jharkhand.

06 of 2010

21.08.2010

27.

An application under Section 86 (i) (f) of the Electricity Act, 2003 for a direction to Respondent -Jharkhand State Electricity Board to sign the Power Purchase  Agreement (PPA) between the Petitioner -BHPC and Respondent -JSEB in respect of sale of power to JSEB from different Hydro Electric Projects located in State of Jharkhand.

06 of 2010

26.06.2010

26. An Application U/s 76 of the Electricity Act, 2003.

10 of 2010

12.06.2010

25.

Petition for Seeking Permission for issue of power connection to Water treatment plant of PHED (Govt. of Jharkhand), Near Old Purulia Road, Mango and Intake Well Plant, Kunwar Basti, Mango, PHED, Government of Jharkhand, both are outside the licensed area.

07 of 2010

11.05.2010

24.

An application under Section 86 (i) (f) of the Electricity Act, 2003 for a direction to Respondent -Jharkhand State Electricity Board to sign the Power Purchase  Agreement (PPA) between the Petitioner -BHPC and Respondent -JSEB in respect of sale of power to JSEB from different Hydro Electric Projects located in State of Jharkhand.

06 of 2010

08.05.2010

23.

An application under Section 86 (i) (f) of the Electricity Act, 2003 for a direction to Respondent -Jharkhand State Electricity Board to sign the Power Purchase  Agreement (PPA) between the Petitioner -BHPC and Respondent -JSEB in respect of sale of power to JSEB from different Hydro Electric Projects located in State of Jharkhand.

06 of 2010

17.04.2010

22.

Petition for a direction upon the Jharkhand State Electricity Board (SLDC) to facilitate the petitioner in order to grant short term open access permission for sale of power on Power Exchange.

02 of 2010

25.02.2010

21. Order on show-cause of JSEB for fixation of Tariff.

01 of 2010

20.02.2010

20.

Order on show-cause of JSEB for fixation of Tariff.

01 of 2010

15.02.2010

19. Order on show-cause of JSEB for fixation of Tariff.

01 of 2010

29.01.2010

18. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

09.01.2010

2009
17. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

05.12.2009

16. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

14.11.2009

15. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

31.10.2009

14. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

15.10.2009

13. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

03.10.2009

12. An application for determination of Distribution  and Retail Tariff and for interim/provisional tariff of Damodar Valley Corporation.

16 of 2009

03.10.2009

11. Petition for Right to OPEN ACCESS as provided under section 9(2) of Electricity Act 2003.

17 of 2009

15.09.2009

10.

An application for determination of Distribution  and Retail Tariff and for interim/provisional tariff of Damodar Valley Corporation.

16 of 2009

14.09.2009

09.

An application for determination of Distribution  and Retail Tariff and for interim/provisional tariff of Damodar Valley Corporation.

16 of 2009

11.09.2009

08.

An application for a declaration that the agreement executed between the petitioner and the respondent - JSEB is in conflict with the Tariff Order 2003-04 and for a clarification to the effect that the load of consumer's induction furnace cannot be determined by the respondent -JSEB on the basis of source power, which is inconsistent with the Tariff Order 2003-04.

03 of 2009

11.09.2009

07. An application for modification of order dated 07.02.2006  Passed by the Commission by which the Commission did not allow the petitioner -JSEB to collect additional security from its consumers.

07 of 2009

05.09.2009

06.

An application for modification of order dated 07.02.2006  Passed by the Commission by which the Commission did not allow the petitioner -JSEB to collect additional security from its consumers.

07 of 2009

22.08.2009

05.

An application for a declaration that the agreement executed between the petitioner and the respondent - JSEB is in conflict with the Tariff Order 2003-04 and for a clarification to the effect that the load of consumer's induction furnace cannot be determined by the respondent -JSEB on the basis of source power, which is inconsistent with the Tariff Order 2003-04.

03 of 2009

13.08.2009

04.

An application for modification of order dated 07.02.2006  Passed by the Commission by which the Commission did not allow the petitioner -JSEB to collect additional security from its consumers.

07 of 2009 08.08.2009
03.

An application for modification of order dated 07.02.2006  Passed by the Commission by which the Commission did not allow the petitioner -JSEB to collect additional security from its consumers.

07 of 2009 01.08.2009

02.

Regarding Fuel Cost Surcharge. 08 of 2009 06.07.2009

01.

An application for modification of order dated 07.02.2006  Passed by the Commission by which the Commission did not allow the petitioner -JSEB to collect additional security from its consumers.

07 of 2009 04.07.2009